Estimating and Costing

by Thomas Grant
0 comment

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

Correct! Wrong!

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and...

Correct! Wrong!

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

Correct! Wrong!

The item of the brick structure measured in sq.m, is

Correct! Wrong!

The inspection pit or chamber is a manhole provided in a base drainage system

Correct! Wrong!

Pick up the excavation where measurements are made in square metres for payment.

Correct! Wrong!

Pick up the correct statement from the following:

Please select 2 correct answers

Correct! Wrong!

The plinth area of a building not includes

Correct! Wrong!

The expected out turn of 2.5 cm cement concrete floor per manson per day

Correct! Wrong!

Pick up the incorrect statement regarding a master trap from the following :

Correct! Wrong!

While preparing a detailed estimate

Correct! Wrong!

The brick work is measured in sq metre, in case of

Correct! Wrong!

Pick up the correct statement from the following:

Correct! Wrong!

Brick walls are measured in sq. m if the thickness of the wall is10 cm

Correct! Wrong!

Pick up the item of work not included in the plinth area estimate

Correct! Wrong!

The area of the cross-section of a road fully in banking shown in the given figure, is