Menu

Estimating and Costing

Thomas Grant 5 years ago 0 0

The area of the cross-section of a road fully in banking shown in the given figure, is

Correct! Wrong!

Pick up the correct statement from the following:

Please select 2 correct answers

Correct! Wrong!

The plinth area of a building not includes

Correct! Wrong!

For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is

Correct! Wrong!

The item of the brick structure measured in sq.m, is

Correct! Wrong!

The expected out turn of 2.5 cm cement concrete floor per manson per day

Correct! Wrong!

Pick up the correct statement in case of water supply.

Correct! Wrong!

Brick walls are measured in sq. m if the thickness of the wall is10 cm

Correct! Wrong!

The concrete work for the following part of the building of specified thickness is measured in square metres

Correct! Wrong!

Pick up the excavation where measurements are made in square metres for payment.

Correct! Wrong!

A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.

Correct! Wrong!

The height of the sink of wash basin above floor level is kept

Correct! Wrong!

In case of laying gullies, siphons, intercepting traps, the cost includes

Correct! Wrong!

The minimum width of a septic tank is taken

Correct! Wrong!

The inspection pit or chamber is a manhole provided in a base drainage system

Correct! Wrong!

The order of booking dimensions is

Correct! Wrong!

The correct prismoidal formula for volume is

Correct! Wrong!

While preparing a detailed estimate

Correct! Wrong!

The brick work is measured in sq metre, in case of

Correct! Wrong!

Pick up the item of work not included in the plinth area estimate

Correct! Wrong!

Pick up the correct statement from the following:

Correct! Wrong!

The expected out turn of cement concrete 1 : 2 : 4 per mason per day is

Correct! Wrong!

Pick up the incorrect statement regarding a master trap from the following :

Correct! Wrong!

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and...

Correct! Wrong!

As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken

Correct! Wrong!

Estimating and Costing

Perfect

Share your Results:

– Advertisement –      (adsbygoogle = window.adsbygoogle || []).push({});
Written By

Iam a civil engineer I share on this blog the news concerning construction

Leave a Reply

Leave a Reply

Your email address will not be published. Required fields are marked *

– Advertisement –      (adsbygoogle = window.adsbygoogle || []).push({});